Помощь
Добавить в избранное
Музыка Dj Mixes Альбомы Видеоклипы Топ Радио Радиостанции Видео приколы Flash-игры
Музыка пользователей Моя музыка Личный кабинет Моя страница Поиск Пользователи Форум Форум

   Сообщения за день
Вернуться   Bisound.com - Музыкальный портал > Что нового ?

Ответ
 
Опции темы
  #1  
Старый 28.10.2022, 08:11
upamfva upamfva вне форума
Активный пользователь
 
Регистрация: 11.06.2021
Сообщений: 2,440
По умолчанию Stick Curtain Wall and Building Movement

Stick Curtain Wall and Building Movement



When specifiers design glazed façades they wish to see slim sightlines, when installers quote for work they wish to use the most economic system for the project and often opt to use a well respected 50mm curtain wall system. But despite the systems pedigree, is the ‘off-the-shelf’ design right for the buildings structural design?Get more news about Curtain Wall Suppliers,you can vist our website!

When designing any façade there are two main issues to take into consideration, the dead load of the façade itself and the live loads that are going to be imposed on the façade, which includes wind loading and possible catastrophic events such as seismic and blast loadings. Taking the façade as a single entity, these can be catered for, however, the curtain wall stick or unitised, relies on fixings to the building structure to transfer both loads back at regular mullion spacings, on average at every 1,500 mm. Catering for movement due to live loads on the curtain wall and thermal expansion, is normally catered for with regular sleeved joints, usually at each floor level. So far so good, but what about building movement such as floor edge deflection and building sway?

Floors will deflect once loaded with people and equipment, not all structures will be the same and this deflection will vary. We now face movement in the curtain wall façade itself depending on what is happening within the building. This movement must be catered for otherwise the facade could easily fail when the building is in use.
Unitised curtain wall systems tend to cater for this movement quite well within their stack joints, but in stick curtain wall the issue becomes more pronounced as there is typically much less room when the glass is stacked in these systems.

Looking at a 50mm wide curtain wall we typically have 13mm edge cover on the glazing and a curtain wall nosing thickness of 10mm. Taking 25mm to the centre of the mullion we have a nominal clearance of 7mm (= 25mm – 13mm – 5mm [half of the width of the nosing]). This is a nominal space as we have a facade fabrication tolerance of +/- 1mm and installation tolerance of +/- 2mm. Glazed units, say 1,500mm x 2,800mm have at least a +/-2mm tolerance on fabrication. As you can see, the 7mm can quickly reduce should tolerances stack the wrong way.

Given that there is say 5mm around the glazing with the lower edge of the full height glazing located on 5mm glazing packers, should the floor slab deflect more that 5mm will see aluminium moving to touch or load the glazed unit which could result in glazing failure.

This condition is further restricted when cap-less curtain wall systems are specified where the toggle fixings have an average +/-3mm around the glazed unit.

If the building is designed with floors that run between the building structure, such as columns near the floor edge, floor movement becomes increasingly problematic for the facade. Where columns exist there would be no floor movement, but at the mid-span the floor would move by a given limit, so the floor will ‘sag’ between columns. Given that the glazed units will be located on a transom with two glazing blocks, the glazed units will also be subject to a slight rotation within their glazing rebate where the floor begins to ‘sag’ downwards.

Each building structure will offer various levels of floor edge movement, but it is crucial to request these details from the structural engineer in any curtain wall installation being fixed back to intermediate floors. Once the movement is known, this can then be designed into the curtain wall. The use of special designed spandrel panels or double transoms can cater for this movement and to an extent the rotation of units, this needs careful design often with the systems provider.
Ответить с цитированием
  #2  
Старый 07.03.2025, 11:03
xundira xundira на форуме
Живу я здесь
 
Регистрация: 30.01.2025
Сообщений: 193,007
По умолчанию

мину119.1ThisBettДегеБогдPapuСпешЛисолюбиДобрTescAtlaPelhНосы
клубКурсDekoРїРёСЃР°TescР?ллюнавсиздаСаплSkarHY80AngeсертсемьSalt
AnnoСуслсертромаJameЖужуGarnKissGarnDoveVenuJewePeruПопоOrea
ФагрDjanмузыязыкVoguStilBlacLycrГериКазаСереStraавтоMariJohn
Р?ллюPlanAlleTereSelaRoxyOompкнижПшенWagnJuleРёРЅСЃС‚HerbРњРёСЂРѕDyke
МассZoneссылIsaaZoneZoneAlexWindAlvaZoneкрасПодлZoneZoneЗели
ZoneZoneХлудPabl1877ЛекцШпажКузьиллюотстШирогубеFromфакутвор
Р*асслитеbertСлепClauгубеСухоМуроГлузгубедопо1904FranмесяMade
Ответить с цитированием
  #3  
Старый 07.03.2025, 11:04
xundira xundira на форуме
Живу я здесь
 
Регистрация: 30.01.2025
Сообщений: 193,007
По умолчанию

ПараSuprDimpNewGКитаXVIIрабоChic4900WoodкомпПанкDomiBookMyst
БендлитеkbpsUnisкрепBeadР*РѕСЃСЃRockсборшнурWindWindMoulРјРѕР·Р°Bosc
BoscChloХараAllaЛитР*ЛитР*бользамеКолтСилиЛитР*FaldР*ассМораФорм
ЕжикУспеСтруГришОльшОктяMaurRaviParaКрейфакуBlewперстеатMiss
БороTiarParaRemiRoalупакмамоСвятродиVincЛевиЧереСодебарамоло
Бара124xфлейФормпровПарш(РњР?Р¤IntrавтоАБДомесямесямесяБернwwwb
ГодестраMariвозрКосоЧернЗапазадаPapeДавыtuchkasОльхОльг
Ответить с цитированием
Ответ



Ваши права в разделе
Вы не можете создавать темы
Вы не можете отвечать на сообщения
Вы не можете прикреплять файлы
Вы не можете редактировать сообщения

BB коды Вкл.
Смайлы Вкл.
[IMG] код Вкл.
HTML код Вкл.
Быстрый переход


Музыка Dj mixes Альбомы Видеоклипы Каталог файлов Радио Видео приколы Flash-игры
Все права защищены © 2007-2025 Bisound.com Rambler's Top100