Introduction
Understanding the
MEP*BIM*Services workflow is crucial to maximizing its value. Each stage—from concept to as-built model—is designed to eliminate inefficiencies and improve construction performance.
The MEP BIM Workflow Explained
Conceptual Design
Early layout planning, space allocation, and preliminary clash detection.
Detailed Design & Modeling
Development of full 3D MEP models with required LOD (300–500).
Clash Detection & Coordination
Using tools like Navisworks to detect conflicts between systems.
Construction Documentation
Generating shop drawings, spool drawings, and BOQs directly from the model.
As-Built and Facility Management
Delivering a digital twin to the client for lifecycle operations.
Tools Used in MEP BIM Services
Autodesk Revit
Navisworks Manage
BIM 360
AutoCAD MEP
Conclusion
MEP BIM workflows provide structured, logical processes that reduce delays and improve coordination. Mastering the workflow means delivering better buildings, faster and smarter.